JASUNG

Industry


这里是标题一h1占位文字

Jasung Gearless Motor Pulley Used in Coal Mine

Project Overview​

Equipment Mining Explosion-Proof Three-Phase PMDD Pulley
Model FTYB22-4.0-500×1000
User Pingdingshan Tian'an Guiye Co., Ltd.  
Location Coal Building Conveyor System
Commissioning July 2019 – Present

 

Challenge & Solution​​ ​​Pre-Installation Issues

• Low transmission efficiency due to gearbox/hydraulic coupling losses.

• Frequent maintenance and high failure rates in explosive methane environments.

• Limited space for bulky traditional drive systems.

 

Our Solution​​

Deployed FTYB22-4.0-500×1000 PMDD Pulley with:

• ​​Integrated Permanent Magnet Direct Drive (PMDD) – Eliminated gearbox/couplings.

• ​​MA Explosion-Proof Design– Certified for coal dust/methane environments.

• Compact Air-Cooled System– Space-saving and easy installation.

 

​​Performance Results​​

Metric Improvement
Transmission Efficiency ↑ 18% (vs. traditional gearbox systems)
Energy Savings Significant cost reduction (ROI < 1 year)
Installation Space ↓ 60% footprint reduction
Starting Torque 2× rated torque (full-load startup)
Maintenance ↓ 70% workload; near-zero failures

 

Operational Benefits

• Reliability​​: Stable operation since 2019 with minimal downtime.

• Automation Integration​​: Enabled centralized control, advancing mine intelligence.

 

Onsite video

• Labor Impact​​: Reduced worker intensity and safety risks.

 

Customer Testimonial​​

"The PMDD pulley solved our efficiency and maintenance challenges. Its explosion-proof design ensures compliance, while the 18% energy savings exceeded expectations."

​​— Tenth Mine Maintenance Manager​

Related Industries